BFlat 68c924047d Merge pull request #1431: integration batch 33 (85 reviewed contributor PRs)
Integration batch 33: main green again, 85 reviewed contributor PRs
2026-10-13 12:16:54 +07:00
2026-10-13 00:13:49 -04:00
2026-10-13 12:09:34 +07:00
2026-10-11 12:43:20 +00:00
2026-10-11 12:00:20 +00:00
2026-10-12 11:13:08 -04:00
2026-10-12 11:13:08 -04:00
2026-10-11 12:00:20 +00:00
2026-10-11 11:57:45 +00:00
2026-10-13 11:05:35 +07:00
2026-10-13 11:01:44 +07:00

ArtCraft

LightCraft

Your photos. Your pixels. Your machine.

English · 简体中文

Photo library and raw development; an open-source, clean-room reimplementation of Adobe Lightroom, rebuilt in pure Rust.
Native on macOS, Windows and Linux. In the browser via WebAssembly. Drivable end to end by AI agents over MCP.

Pure Rust macOS, Windows, Linux and Web MCP server included License: MIT OR Apache-2.0 Status: young and moving fast

Join the ArtCraft community on Discord

LightCraft on getartcraft.com · ArtCraft · All Crafting Apps


LightCraft's Edit view with Ansel Adams' The Tetons and the Snake River in the loupe, the Light and Effects panels open on the right, and the four showcase photos in the filmstrip
Ansel Adams, "The Tetons and the Snake River" (1942). Public domain, U.S. National Archives. Developed in LightCraft.

Note

ArtCraft is a community of artists from all walks of life. Digital, generative, music, games — if you make things, you're one of us. Come say hi on Discord.

Editing · Color grading · Before & after · Masking · Presets · Library · Agents & MCP · Performance · Status · Quick start · Roadmap · Downloads · Crafting Apps


Edit like you mean it

LightCraft is a complete darkroom in a single native app. Every adjustment is non-destructive, so your originals are never touched. Every slider renders through a scene-referred, wide-gamut, 32-bit float pipeline: highlights roll off like film, shadows open up without halos, and colour stays clean from capture to export.

☀️ Light

Exposure, Contrast, Highlights, Shadows, Whites, Blacks, with edge-aware local tone mapping (a guided filter on log-luminance). Pulling −100 Highlights recovers a blown sky without the grey halos you'd get from a naive curve.

🎨 Color

White balance by temperature and tint (Kelvin for raw, relative for JPEG) with presets, Auto and a click-to-neutralise eyedropper. Vibrance that protects skin tones, Saturation, an 8-band Color Mixer (hue / saturation / luminance) and 3-way Color Grading wheels with blending and balance. All of it is computed in OkLCh, a modern perceptual colour space.

✨ Effects

Texture for fine detail, Clarity for mid-tone punch, Dehaze (dark-channel prior with guided refinement; push it negative to add atmosphere), post-crop Vignette with highlight priority, roundness and feather, and resolution-independent film Grain with size and roughness.

📈 Tone Curve

Parametric region curve with movable splits plus point curves for RGB, Red, Green and Blue. Curves are monotone by construction, so you never get an accidental tone inversion.

The Tone Curve open under the Light panel, with a gentle S-curve on the RGB point curve applied to The Tetons and the Snake River
A gentle S on the RGB point curve, right under the Light sliders. Ansel Adams, 1942 (public domain).


Color grading, the cinematic way

Split-tone shadows, midtones and highlights independently with drag-anywhere colour wheels. Below, Dorothea Lange's Migrant Mother gets a warm, print-like tone (highlights at 42°, shadows at 28°) in two drags.

Color Grading wheels for midtones, shadows and highlights next to Dorothea Lange's Migrant Mother, toned warm like a print
Shadows, midtones and highlights wheels in the Color panel. Dorothea Lange, "Migrant Mother" (1936). Public domain, Library of Congress.


Before & after

Hold \ to peek at the original, press Y for side by side, or Shift+Y for a split view. Every image below is a real screenshot of LightCraft, captured automatically by an agent through the control channel.

Side-by-side before and after of The Tetons and the Snake River: the after has deeper clouds and more open shadows along the river
The Tetons and the Snake River. Highlights −45, Shadows +38, Clarity +28, Dehaze +18. Ansel Adams, 1942 (public domain).
Side-by-side before and after of Migrant Mother: the after is warmer, with lifted shadows
Migrant Mother. Shadows +42, Texture +18, split-toned grade, vignette. Dorothea Lange, 1936 (public domain).
Side-by-side before and after of Earthrise: the Earth over the lunar horizon, the after slightly warmer and richer
Earthrise. Dehaze +22, Highlights −30, warmer white balance, Vibrance +22. NASA / Bill Anders, Apollo 8, 1968 (public domain).
Side-by-side before and after of The Blue Marble: the after has deeper blacks and firmer cloud detail
The Blue Marble. Highlights −38, Blacks −20, Dehaze +15, Vibrance +30. NASA, Apollo 17, 1972 (public domain).

Masking that goes where you point

Paint with a Brush (size, feather, flow, density, erase), drop Linear and Radial Gradients with draggable pins, or select by Luminance Range, Color Range, Sky, Subject and Background. Combine components with Add / Subtract / Intersect, invert any of them, and dial in 15 local adjustments per mask (Temp, Tint, Exposure, Contrast, Highlights, Shadows, Whites, Blacks, Texture, Clarity, Dehaze, Hue, Saturation, Sharpness, Noise) plus an overall Amount.

Masking panel with a linear Sky mask and a radial Sun glow mask; the radial gradient is drawn as a red overlay around the sun on a lake scene
A radial "Sun glow" mask (Temp +40, Exposure +0.50) layered over a linear "Sky" mask. Photo from LightCraft's procedurally generated demo library.


Presets, profiles & the Color Mixer

Eighteen hand-built presets ship in the box (Golden Hour, Teal & Orange, Faded Matte, Selenium Tone, Crisp Landscape and more), each with an Amount slider from 0 to 200 %. Save your own from any group of settings, mark favourites, and copy, paste or sync edits across a whole selection with exactly the groups you choose.

Presets column grouped into B&W, Color, Film, Landscape, Portrait and Style, beside the Color panel with the 8-band Color Mixer open on purple
The Presets column next to the 8-band Color Mixer. Photo from the demo library.

✂️ Crop, straighten & geometry

Free or locked aspect ratios (1:1, 4:5, 5:7, 2:3, 4:3, 16:9, 16:10, original), drag-to-rotate straightening that always keeps the largest crop inside the image, thirds / grid / golden-ratio overlays, flips and 90° rotations, plus manual Vertical, Horizontal, Rotate, Aspect, Scale and Offset transforms.

⚫️ Black & White

One click (V) to monochrome, with an 8-band B&W Mix that lets you darken skies or make foliage glow. Then tone it with Color Grading for selenium, sepia or split-tone prints.

Crop tool on The Tetons and the Snake River: a 16 by 9 crop rotated slightly, with a rule-of-thirds overlay and the Geometry sliders on the right
A 16:9 crop straightened +2.5° with the thirds overlay. Ansel Adams, 1942 (public domain).
Split before and after view of sand dunes: color on the left, black and white with grain and vignette on the right
Split view: colour original on the left, B&W with Clarity, Vignette and Grain on the right. Demo library.

Organize everything

A library that stays out of your way: All Photos, Recently Added, Picks, By Date, Albums nested in Folders, and Recently Deleted. Rate with 0–5, flag with P / X / U, colour-label with 6–9. Search understands fields: rating:>3 flag:pick iso:>800 camera:x2 date:2026-04 keyword:mountains. Every view sorts by capture date, import date, edit date, name, rating, size or at random (a stable shuffle; View → Sort → Reshuffle for a new one). The justified Photo Grid and Square Grid views are virtualized, so they stay smooth whether you have forty photos or forty thousand.

Justified Photo Grid of 24 demo photos with ratings and flags, and a sidebar of nested albums under a Travel 2026 folder
Photo Grid with albums nested in a folder, ratings and flags. Demo library.
Square Grid showing the four public-domain showcase photos with star ratings and pick flags
Square Grid of the four public-domain showcase photos.
Info panel for Earthrise showing file name, 2400 by 2400 JPEG dimensions, rating, title field and camera metadata
The Info panel: file, dimensions, rating, title, caption, copyright and camera metadata. NASA / Bill Anders, "Earthrise", Apollo 8, 1968 (public domain).

Built for agents

Every menu item, slider, brush stroke, crop handle and keystroke in LightCraft is a command with a stable id and JSON parameters. The UI, the keyboard, the CLI, a JSON-lines control channel and an MCP server all dispatch through the same entry point. An agent can cull a shoot, develop it, mask a sky and export it, and see the result.

lightcraft --control 7980 ~/Pictures/trip
{"method": "engine.execute", "params": {"command": "photo.flag",  "params": {"flag": "pick"}}}
{"method": "engine.execute", "params": {"command": "develop.set", "params": {"values": {"light.highlights": -45, "light.shadows": 38}}}}
{"method": "engine.execute", "params": {"command": "mask.add",    "params": {"kind": "radial", "center": [0.62, 0.4], "rx": 0.2, "ry": 0.14}}}
{"method": "ui.clickWidget",   "params": {"id": "slider:effects.clarity"}}       // drive any widget by name
{"method": "ui.pointer",       "params": {"events": [{"kind":"down","x":0.2,"y":0.3}, {"kind":"up","x":0.4,"y":0.3}]}}
{"method": "ui.screenshot",    "params": {"path": "after.png"}}
  • Command registry. engine.commands lists the available commands; develop.controls lists every slider's range, default and current value.

  • MCP server. lightcraft-cli mcp exposes the command registry to Claude (or any MCP client), alongside helpers for import, query, develop, mask, render (returned as an image) and export. It runs headless, or attached to the running app with screenshots, clicks and gestures. See docs/mcp.md.

    cargo build --release -p lightcraft-cli
    claude mcp add lightcraft -- "$PWD/target/release/lightcraft-cli" mcp ~/Pictures/shoot          # headless
    claude mcp add lightcraft-app -- "$PWD/target/release/lightcraft-cli" mcp --connect 127.0.0.1:7980  # live app
    
  • Scriptable CLI: lightcraft-cli run --import in.dng develop.set control=light.exposure value=0.7 app.export path=out.jpg longEdge=2048 runs any chain of commands (headless, on a saved library, or against the running app) and prints one JSON result per command; lightcraft-cli render in.dng -o out.jpg --set light.exposure=0.7 --preset ….

  • Undo for everything, including agent actions: a slider drag (or a scripted burst of updates) is one undo step.

  • Contact sheets (native app / CLI): select photos, then File → Contact Sheet PDF…. Choose A4 or Letter, landscape, rows/columns and filename captions; save a paginated PDF and print it from your PDF viewer. Exports use the current edits, fit each photo without further cropping, and render at 150 dpi in sRGB. The background export supports cancellation and protects originals and XMP sidecars. From the CLI:

    lightcraft-cli run --import ~/Pictures/shoot library.selectAll export.contactSheet path=Contact.pdf paper=a4 columns=3 rows=4 captions=true
    

    export.contactSheet also accepts explicit ids, landscape=true, and paper=letter. It replaces an existing output only after the entire PDF succeeds. Limits: 1,000 photos, 100 pages, 256 MiB; captions are rasterized with the same font coverage as watermarks (CJK requires craft-fonts), with long names shortened in the middle. This is a contact-sheet workflow, not a printer-driver or custom picture-package layout editor.

  • Every widget is addressable (ui.widgets) and clickable by name, so agents operate the real UI, not a side door.

  • The screenshots in this README were produced end to end by the docs/showcase/ scripts. Protocol reference: docs/control-protocol.md.


Fast, native, private

  • Pure Rust, no C. Our own RAW decoders (DNG, Canon CR2/CR3, Sony ARW, Nikon NEF, Fujifilm RAF incl. X-Trans, Panasonic RW2 / Leica RWL, Pentax PEF, Olympus ORF), our own colour science, our own pipeline. JPEG, PNG, TIFF, WebP, PSD composites and JPEG XL open today; HEIC/HEIF photos too with --features heif (HEVC is a build-time choice, as in PhotoCraft).
  • Scene-referred & wide-gamut. Linear Rec.2020 float internally, Bradford-adapted white balance, gamut mapping instead of clipping, a filmic shoulder for raw and pixel-exact pass-through for JPEGs you haven't touched.
  • Resolution-independent edits. Radii and brush sizes are relative to the image, so a 400 px preview, your 5K display and a 60 MP export look the same.
  • GPU-accelerated, CPU-exact. The whole develop pipeline runs as wgpu compute kernels (Metal / Vulkan / DX12), checked against the CPU pipeline to within 1/255. On a 24 MP raw (Apple M4 Pro): a slider update re-renders in ~4 ms, a cold 2.5 MP loupe in ~30 ms, and a full-size export in ~0.3 s including a parallel JPEG encode. Without a GPU the same pipeline runs on all CPU cores, redoing only the stages a slider affects. Batch exports render several photos side by side, so one's decode and encode overlap another's render.
  • Instant culling. Opening a raw shows its embedded camera preview or cached render within ~0.1 s while the full render follows (~0.2–0.5 s for 24 MP). The next and previous photos are prepared in the background, so stepping through a shoot takes ~50 ms per photo.
  • Background rendering. A worker pool renders the loupe, before/after and every visible thumbnail off the UI thread: drafts during drags, full quality on release.
  • Local-first. No account, no cloud, no telemetry, no subscription. Your catalog is an append-only log of human-readable operations you can diff, back up or replay.

Feature status

LightCraft is young and moving fast: alpha. Where we honestly stand (details in the roadmap and docs/target-app-parity.md):

  • By feature count we're at ~81% of Lightroom (core features 98%), tracked row by row in docs/parity-checklist.md.
  • As a day-to-day Lightroom replacement we're nearer 61% for the whole product, ~49% for a typical working photographer and ~64% for casual use. It's great for JPEG/DNG and most Sony / Panasonic / Fujifilm / Nikon / older-Canon raws on one machine; see docs/raw-parity.md for your camera.
  • The biggest gaps:
    • camera colour calibration: Sony, Nikon, Panasonic, Fujifilm and Canon CR3 raws have guarded estimates from their camera JPEGs, with built-in ILCE-7CR, ILCE-7M4, X-H2S and X-T4 profiles; measured calibration is missing, and other raws or rejected fits retain a neutral matrix;
    • compressed Olympus raws and unsupported CR3 variants: these use embedded JPEG previews when present. Fujifilm lossless/lossy compressed RAF now decodes sensor data; verification and existing-library reload instructions;
    • AI masks and denoise: subject and sky selection are classical heuristics;
    • network libraries: a preview reads the raw's header — or, for a CR3 or a TIFF raw whose preview tag sits past it, exactly the ranges the sparse planner names — and its embedded JPEG only (56.5 MB → 5.9 MB, 10 s → 1 s on the test share), but the developed picture still needs the sensor data over the wire; see docs/raw-preview-reads.md;
    • on-screen HDR display, video and the Classic Print / Book / Map modules.
  • What's next: see the ranked gaps and the roadmap.
Area Status
Library: albums, folders, smart albums, stacks (incl. auto-stack), virtual copies, ratings, flags, labels, filter bar, search, sort, grids, filmstrip ✅
Culling: Compare (synced zoom) and Survey views, auto-advance, instant previews ✅
Light, Color, Effects (vignette styles), Tone Curve (+ refine saturation, targeted adjustment), Color Mixer (+ targeted), Point Color, Color Grading, Calibration, B&W ✅
Masking: brush, linear, radial, luminance/colour range, add/subtract/intersect ✅ (AI subject/sky use classical heuristics for now)
Crop, straighten tool + auto straighten, flip, rotate, aspect ratios, overlays ✅
Profiles (Color, Neutral, Vivid, Landscape, Portrait, Monochrome: our own looks), presets, versions, history, copy/paste/sync settings ✅
Camera colour: DNG files use their own matrices ✅ DNG · 🚧 own Sony/Fujifilm profiles; measured calibration database missing
Native macOS menu bar (generated from the command registry), control channel + every widget addressable, headless UI snapshots ✅
RAW: DNG, CR2, CR3 (lossless CRX Bayer and version 0x100/0x200 C-RAW), ARW, NEF (uncompressed + lossless/lossy compressed, incl. lossy after split), Fujifilm RAF (uncompressed + lossless/lossy compressed, Bayer + X-Trans), Panasonic RW2 / Leica RWL / Panasonic RAW (every raw format, DMC-LX1 to DC-S1RM2), Pentax PEF, Olympus ORF (uncompressed, 12.8 bpp), Samsung SRW (uncompressed); embedded previews for every format incl. CR3 🚧 · other CR3 variants, compressed ORF / SRW and Nikon HE NEF decode ⬜ (raw parity)
Detail: sharpening, luminance + colour noise reduction ✅ · AI Denoise 🚧 (Bayer, user-installed weights), Super Resolution ⬜
Remove / Heal / Clone spots (auto source), Visualize Spots, Red Eye and Pet Eye (auto pupil detection, catchlight) ✅ · content-aware fill, spot pin editing 🚧
Export: JPEG / PNG / TIFF / WebP / AVIF / DNG / original, sizing, file-size limit, output sharpening, naming templates, batch, metadata policy, text or image watermark ✅
HDR: HDR editing with a headroom limit, SDR rendition, Visualize HDR; export as ISO 21496-1 gain map JPEG, PQ AVIF or 32-bit float TIFF ✅ · HDR display ⬜
Library persistence (crash-safe op log + snapshots, background compaction, failed saves reported), disk thumbnail cache ✅
Import: Add in place / Copy / Move, rename and folder templates, devices, duplicate detection, watched folders; Local folder browsing ✅
MCP server (headless or live app, persistent libraries), CLI, control channel ✅
XMP sidecars (read/write, auto-write), reading crs: develop settings, preset files (.lcpreset, XMP presets) ✅
Optics (distortion, vignetting, auto + manual CA, defringe, lens corrections embedded in DNG files and Panasonic / Leica RW2 / RWL distortion data), Geometry (transforms, Constrain Crop), Upright (Auto/Level/Vertical/Full/Guided) ✅ · camera lens profiles (our own) ⬜
Photo Merge: HDR (auto-align, deghost), Panorama (spherical/cylindrical/perspective, boundary warp, auto crop), HDR Panorama → DNG ✅
GPU pipeline (wgpu compute, CPU-exact within 1/255), CPU fallback on device limits / errors ✅ · WebGPU in the browser 🚧
AI: segmentation masks, AI denoise, super resolution, faces; video 🚧 (see gaps)
Web build (same UI in the browser via WASM): persistent library in OPFS/IndexedDB, Web Worker rendering, export downloads ✅ · WebGPU, Safari/Firefox testing 🚧

✅ works today · 🚧 in progress · ⬜ not started


Quick start

Workspace builds, including the desktop, web and CLI applications, require Rust 1.95 or newer.

git clone https://github.com/storytold/lightcraft && cd lightcraft
cargo run --release -p lightcraft                       # opens your library (~/Pictures/LightCraft Library; a new one starts with demo photos)
cargo run --release -p lightcraft -- ~/Pictures/trip    # import your photos (folders are scanned, duplicates skipped)
cargo run --release -p lightcraft -- --memory           # a throwaway in-memory demo session (writes nothing)
cargo run --release -p lightcraft -- --control 7980     # with the automation channel
cargo xtask web --serve                                 # the same app in the browser: http://127.0.0.1:8080/
cargo run --release -p lightcraft-cli -- render photo.jpg -o out.jpg --set light.exposure=0.5
cargo xtask ci                                          # fmt, clippy, tests, layering, wasm checks

CI defaults to line-table debug information and one build job per 1.5 GB of RAM available when it starts (at most one per CPU; 4 if memory can't be read), so an 8 GB machine with 6 GB free builds with 4, and a busy machine with little free builds with fewer. Test threads follow, capped at 4. Full-debuginfo linkers, one per CPU, otherwise exhaust RAM before any test runs. GPU coverage is unchanged. Explicit CARGO_PROFILE_DEV_DEBUG, CARGO_BUILD_JOBS and RUST_TEST_THREADS settings override these defaults. Ordinary development commands keep their own settings.

Chinese and Japanese text need the shared font repo, an optional build input (official releases always include it):

git clone https://github.com/storytold/craft-fonts ../craft-fonts
CRAFT_FONTS_DIR=../craft-fonts cargo run --release -p lightcraft

Without it LightCraft builds and runs the same, but Chinese and Japanese text have no glyphs. Fonts are never committed to this repo — the standard for what goes there lives with it: see the craft-fonts README.

Interface language: Edit → Language (English, 简体中文, 繁體中文(台灣), 日本語, Português (Brasil), Español, Deutsch, Русский, Français) or Settings → General → Language; the choice applies immediately and persists. See docs/localization.md.

Logs: the desktop app writes its log to standard error and to logs/lightcraft.log in its settings folder (Linux $XDG_CONFIG_HOME/lightcraft/logs/, by default ~/.config/lightcraft/logs/; macOS ~/Library/Application Support/LightCraft/logs/; Windows %APPDATA%\LightCraft\logs\), never in the library. A launch from a desktop menu or the Dock has no terminal, so attach this file to a bug report (Help ▸ Open Log Folder shows it in the file manager). Each start moves the previous log to lightcraft.1.log and that one to lightcraft.2.log, so the log of a run that crashed survives the next start; the file stops growing at 16 MiB, --version and --help write none, and runs with LIGHTCRAFT_NO_PREFS log to standard error only. By default LightCraft's own crates log at info and everything else at warn. LIGHTCRAFT_LOG=info or debug works as before (that level for LightCraft's own crates, warnings and errors from the rest; any other value: warnings and errors only) and wins over RUST_LOG, which otherwise replaces the default with env_logger-style directives such as RUST_LOG=debug or RUST_LOG=warn,lightcraft_pipeline=trace (a directive ending in * covers every target starting with it, as in lightcraft*=debug). Panics are recorded there too, and still in lightcraft-panics.log in the temp folder. The logger is apps/lightcraft/src/logging.rs.

The web build needs the wasm32-unknown-unknown target and the matching wasm-bindgen CLI (cargo xtask web prints the exact install command); see docs/web.md.

Nix builds the desktop app and lightcraft-cli (the Nix build always includes the craft-fonts input, so Japanese text has glyphs):

nix run github:storytold/lightcraft                    # the desktop app
nix build github:storytold/lightcraft                  # → ./result/bin/{lightcraft,lightcraft-cli}
nix develop github:storytold/lightcraft                # rust toolchain + native deps + fonts

On NixOS, run a cargo build from nix develop: outside it the app can't find libvulkan.so.1, finds no GPU and renders on the CPU, much more slowly (it says so once at start-up). nix run and nix build set the path themselves.

In a flake configuration (NixOS, home-manager, nix-darwin):

# flake.nix
inputs.lightcraft.url = "github:storytold/lightcraft";
# optional: build against your own nixpkgs instead of the one LightCraft pins
# inputs.lightcraft.inputs.nixpkgs.follows = "nixpkgs";

# then, in a NixOS or home-manager module (where `inputs` is in scope):
nixpkgs.overlays = [ inputs.lightcraft.overlays.default ];   # makes `pkgs.lightcraft` available
environment.systemPackages = [ pkgs.lightcraft ];           # home-manager: home.packages = [ pkgs.lightcraft ];

nix build installs the same desktop file, hicolor icons and AppStream metadata as the .deb/.rpm, and runs cargo test --workspace as its check phase (skip it with pkgs.lightcraft.overrideAttrs { doCheck = false; }).

Keyboard: G grid · D detail · E edit · C crop · M masking · Shift+P presets · \ original · Y before/after · Z zoom · J clipping · ⌘Z undo · ⌘/ all shortcuts.

How it's built

An engine-first Cargo workspace of small, tested crates with enforced layering (cargo xtask layers): geom, color, raster, tiff → raw, codecs, meta, develop → pipeline → catalog → engine → ui-egui. The egui frontend is one swappable crate; nothing below it knows a UI exists. mcp and the apps (lightcraft, lightcraft-cli) sit on top of engine.

Contributing

Humans and agents follow the same rules, so read AGENTS.md first. The short version:

  • Clean-room. Never read Adobe binaries or GPL raw/photo code (darktable, RawTherapee, LibRaw, rawspeed, dcraw…); work from public specs and black-box observation.
  • No Adobe assets, ever: no icons, screenshots, presets, profiles, LUTs or fonts from Adobe products. Every image, icon and font in the repo is original, public domain, Creative Commons, OFL or permissively licensed, and has an entry in assets/ATTRIBUTION.md added in the same commit. New fonts go to storytold/craft-fonts, not here.
  • Pure Rust, enforced crate layering, everything is a command, and cargo xtask ci green before every commit (one task id per commit).
  • Never crash. Non-test code returns errors instead of panicking: no unwrap(), expect(), panic! or unsafe, checked indexing on anything derived from input, and a regression test with every crash fix. Details in AGENTS.md.

Questions, ideas or a bug you'd like to talk through first? Bring them to Discord.


Downloads

New to LightCraft? Download it from the LightCraft page on getartcraft.com. That's the easiest way to install it.

Want a specific build or format? On GitHub, the latest release has every build listed below, and all releases has earlier versions and their notes. <ver> in the file names is the version number, and SHA256SUMS.txt lists a checksum for every file.

Windows

Build Installer Portable
x64 (64-bit Intel/AMD) lightcraft-<ver>-windows-x64.msi lightcraft-<ver>-windows-x64-portable.zip
arm64 (Snapdragon and other ARM PCs) lightcraft-<ver>-windows-arm64.msi lightcraft-<ver>-windows-arm64-portable.zip
x86 (32-bit) lightcraft-<ver>-windows-x86.msi lightcraft-<ver>-windows-x86-portable.zip

Installers and executables are code-signed. The installer asks where to install (C:\Program Files\LightCraft by default; upgrades stay in the folder you chose) and ends on a page confirming LightCraft was installed, with an option to start it. For unattended installs: msiexec /i lightcraft-<ver>-windows-x64.msi /qn INSTALLFOLDER="D:\Apps\LightCraft\".

macOS

Build File Notes
App, universal (Apple silicon + Intel) lightcraft-<ver>-macos-universal.dmg Signed and notarized
Command-line tool, universal lightcraft-cli-<ver>-macos-universal.zip Signed and notarized

Linux

Format x86_64 aarch64 (ARM64) Notes
AppImage lightcraft-<ver>-linux-x86_64.AppImage lightcraft-<ver>-linux-aarch64.AppImage Runs anywhere; updates itself with AppImageUpdate (.zsync files)
Flatpak lightcraft-<ver>-linux-x86_64.flatpak lightcraft-<ver>-linux-aarch64.flatpak Sandboxed; flatpak install --user <file>
Debian/Ubuntu lightcraft-<ver>-linux-x86_64.deb lightcraft-<ver>-linux-aarch64.deb
Fedora/RHEL/openSUSE lightcraft-<ver>-linux-x86_64.rpm lightcraft-<ver>-linux-aarch64.rpm
Tarball lightcraft-<ver>-linux-x86_64.tar.gz lightcraft-<ver>-linux-aarch64.tar.gz Unpack anywhere

RISC-V (riscv64): lightcraft-<ver>-linux-riscv64.tar.gz, a tarball only (glibc 2.39 or newer, e.g. Ubuntu 24.04+).

On a Wayland desktop LightCraft runs through XWayland when it is available, because only X11 gives windows file drag-and-drop; set LIGHTCRAFT_WAYLAND=1 to use native Wayland (sharper fractional scaling, no drop).

FreeBSD

Build File
x86_64 lightcraft-<ver>-freebsd-x86_64.tar.gz

Web (WebAssembly)

Build File Notes
Static site lightcraft-web-<ver>.zip Runs in a modern browser; host it on any static server

The Crafting Apps

LightCraft is one of the Crafting Apps: free, open-source creative tools from the ArtCraft team, each written from scratch in Rust and each able to stand on its own.

App What it's for Code Learn more
PhotoCraft Image editing: layers, masks, type and real PSD files GitHub Website
VectorCraft Vector illustration GitHub Website
FilmCraft Video editing, color and sound GitHub Website
LightCraft Photo library and raw development · you are here GitHub Website
PdfCraft Reading, organizing and protecting PDFs GitHub Website
EffectCraft Motion graphics and visual effects GitHub Website
DesignCraft Page layout and publishing GitHub Website

And ArtCraft itself, our AI image and video studio for artists who want real control.


Join the ArtCraft community on Discord

Come make things with us

Our Discord is where artists of every kind hang out: people who paint, shoot, draw, cut film, set type, and people still figuring out what they like to make. Share what you're working on, ask for help, tell us what's broken, or tell us what you wish these tools could do. Whatever your medium and however long you've been at it, you're welcome here.

discord.gg/artcraft · getartcraft.com · The Crafting Apps · LightCraft


License and credits

LightCraft is dual-licensed under MIT or Apache-2.0, at your option. Copyright (c) 2026 ArtCraft Team and the LightCraft contributors. Required notices are in NOTICE.

Bundled fonts, icons, images and other assets keep their own open licenses; each one is listed with its author, source and license in assets/ATTRIBUTION.md.

Showcase photographs are public-domain works, used via Wikimedia Commons: Ansel Adams, The Tetons and the Snake River (1942, U.S. National Archives); Dorothea Lange, Migrant Mother (1936, Library of Congress); Bill Anders / NASA, Earthrise (1968); NASA, The Blue Marble (1972). The demo library is procedurally generated by LightCraft. UI font: Inter (SIL OFL 1.1). Builds made with craft-fonts (all official releases) also embed its Chinese and Japanese fonts (Noto Sans CJK SC, BIZ UDPGothic, BIZ UDMincho, Shippori Mincho; SIL OFL 1.1), listed in its ATTRIBUTION.md. All icons are original.

The ArtCraft name, wordmark and logos in docs/brand/ are trademarks of the ArtCraft Team and are not covered by this license. They may be used only unmodified, and only as part of this repository and LightCraft, under docs/brand/LICENSE-brand.txt. Forks and modified versions must remove them.

Adobe, Photoshop, Illustrator, Premiere Pro, Lightroom, Acrobat, After Effects and InDesign are trademarks or registered trademarks of Adobe Inc. in the United States and/or other countries. LightCraft is an independent, open-source project and is not affiliated with, sponsored by or endorsed by Adobe Inc.; these names are used only to describe the workflows it is compatible with.

ArtCraft
Made by the ArtCraft team and community.

Star history

Star History Chart

Library, Tools, and Presets panels can be regrouped, split, floated within the app window, closed, and reopened. Tools keeps the current Edit/Crop/Masking mode; the photo view and filmstrip stay together. Drag a panel header to a target edge or another header. Its context menu offers Float panel, Move to group, and Close panel. Existing panel toggles reopen panels at their saved location; Reset Panel Layout restores the app layout. Floating panels remain inside the current app window.

S
Description
LightCraft: An open-source non-destructive photo editor written by scratch in pure Rust
https://getartcraft.com/apps/lightcraft Readme
72 MiB
0 Stars 1 Watchers 0 Forks
Languages
Rust 98.7%
WGSL 0.5%
Shell 0.4%
PowerShell 0.2%
Python 0.1%
Other 0.1%