Watch Folder renders take the host's memory budget; docs and test comment (#3941 review)

This commit is contained in:
vangel76 committed 2026-11-19 10:37:00 +01:00
1 parent 0d9c69563f
commit 98ada1e8ff
5 files changed
+59 -6

No files matched your search

+6 -4
View File
@@ -192,13 +192,15 @@ Commands (CLI, MCP, control channel):
cache's reserve free on their disk; earlier sessions' copies are adopted. The Disk page shows
the local copies, what is queued and being copied, and the network locations
- `memory.ramReservedGb`: RAM Reserved for Other Applications, the one memory setting (After
Effects has a setting of this name too). EffectCraft's big caches (processed layers, decoded
footage frames, decoded OpenEXR planes, RAM preview frames, and the disk cache's write queue)
share one budget: 80 % of the installed RAM left after the reserve. The other 20 % is room for
Effects has a setting of this name too). EffectCraft's big caches (processed layers, also those
of exports and Render Queue runs, decoded footage frames, decoded OpenEXR planes, RAM preview
frames, and the disk cache's write queue) share one budget: 80 % of the installed RAM left
after the reserve. The command-line tool and its MCP server read the installed RAM once at start
(with the default reserve: they don't read the app's settings). The other 20 % is room for
EffectCraft's own working memory (decoders, render buffers, undo, GPU staging, the interface).
With the default 6 GB reserved that is 8.0 GB on a 16 GB machine, 46.4 GB on 64 GB and 97.6 GB
on 128 GB. The budget is at least 192 MB for all caches together; while the installed RAM is
unknown (a sandbox, the CLI, or the desktop before its first reading) it is 5 GB, in the browser 3.5 GB
unknown (a sandbox, or the desktop before its first reading) it is 5 GB, in the browser 3.5 GB
(with the RAM preview at most 3 GB there). No cache has a share of its own: when they
hold more than the budget together, the memory accountant frees the least valuable data first,
whichever cache holds it, down to 90 % of the budget. An item's value is what it would cost to