Files
craft-libs/.github/workflows
aiongg c0421c7fc6 ci: cancel superseded main runs; a scheduled full run saves the caches
Pushes to main cancel the Workspace run they supersede, as pull requests
already do; the newest push's run tests everything before it. On 16 Nov main
had 144 pushes, each a three-OS run that could not be cancelled, which is much
of what fills the org's macOS runners. Release tags, manual runs and a new
scheduled run every 6 hours keep a group of their own and always finish, and the
scheduled run saves the caches (the gate already saves on scheduled runs of the
default branch). scripts/test-workspace-concurrency.py checks the new policy.

The per-crate workflows, which no longer save caches, cancel superseded runs on
every branch, main included.
2026-11-17 19:09:20 +00:00
..